Whitegate Health Centre is a 10,000m² state-of-the-art health centre housing a wide range of services. The new development was designed to be highly energy efficient and a Combined Heat and Power solution was introduced into the design.
Benefits included:
• Exceeded PCT Energy Targets during bid process
• Demonstrated CO2 reductions were significantly better than the competition and key factor in winning the bid
• PCT target 35 GJ/100m3: Contracted 30 GJ/100m3
• Lower lifetime energy costs
• No premium to M&E capital costs to achieve low CO2