Building Services
  • LocationManchester
  • Value£11m
  • ClientNOV Mono

Patrick Parsons were the lead engineer on the £11m project which enabled pump manufacturer, NOV Mono, to relocate operations from multiple sites in Audenshaw to a single 330,000 sq. foot site in Chadderton, Greater Manchester.

The move allowed the manufacturer to increase capacity and create a number of jobs in response to increased demand.

Patrick Parsons team of specialist mechanical and electrical engineers were responsible for meeting equipment requirements, including fitting LED lighting, compressed air rings, fume extraction, processed water, a Wi-Fi network, waste management yard, spray booths and a shot blaster.

Over 120 detailed mechanical and electrical design drawings were created, as well as an equipment schedule and drawings for tender to coordinate the services and the machine layout, after advising NOV Mono on suitable properties for the facility.